First drop of ballast
By half way through week 3, the first drop of ballast was laid.
Left: The class 73 with two hopper wagons
Right: The first ballast drop (on the centre of the new track) is evened out with the road railer
Images: Jon Goff
The result. The debris on the left of the image was removed by the end of the week.
Image: Bruce Healey



