The Bluebell Railway Goods Division, in conjunction with the Horsted Keynes Carriage Shop, have commissioned an exclusive 00-scale model from Rapido Trains UK.
The LB&SCR Stroudley D1 0-4-2T was designed primarily for suburban passenger duties. Whilst the now famous ‘Terriers’ had proved effective in many ways, they simply couldn’t cope with the heavier trains and were unable to effectively haul suburban services at the speeds and distances required. William Stroudley, Locomotive Superintendent of the LB&SCR, designed this new 0-4-2 tank engine specifically to haul this type of train. The new loco would be designated as the D1, or more commonly the ‘D-Tank’ by crews and railway staff.
Between 1873 and 1887, one hundred and twenty-five examples of the class were built. Despite their size, the D1 boasted an impressive power-to-weight ratio and fuel consumption. This, combined with their good acceleration, enabling them to keep to the timetable, and smooth running, made them very popular with crews. The Class’s ability to pull pretty much anything required also made them a favourite of Shed Foremen, as they could be used to supplement services as required.
In their earlier years, the class were primarily based at London engine sheds. As more of the class were constructed, they were disbursed further across the Brighton network.
This exclusive model of D1 No.236 ‘Ardingly’Â is being offered by the Bluebell Railway Goods Division and the Bluebell Railway Carriage Shop.
Please see full details on the Bluebell Railway Goods Division Shop site.
The full retail price will be £169.95 (DCC Ready) or £279.95 (DCC Sound) and we are asking for a £40 deposit to secure your model. The deposit is fully refundable if required. The remaining balance of £129.95 or £239.95 will be requested nearer the time of delivery. Postage will be calculated when balance is due.
We will offer either postage or collection from the Carriage Shop at Horsted Keynes.
To send the model to production, we need to reach a minimum number of pre-orders. If there is sufficient demand, we may increase the final production quantity to accommodate additional online pre-orders.
We will review the number of pre-orders in January 2027 and contact everyone who has placed an order to confirm whether the project will proceed.


