A few little jobs over the year

Infrastructure Director Tony Astor has listed the achievements of the Infrastructure team over the course of the year as follows:

• Sharpthorne Tunnel track relay

• Installed the reverse Osmosis plant at Sheffield Park

• Re-laid the coping stones on platform 2 at Horsted Keynes

• Repaired the retaining wall on platform 2

• Refurbished the waiting room on platform 1 & 2 at Horsted Keynes

• Built the new disabled loo at Horsted Keynes

• Replaced the below ground drainage on platforms 1 & 2 at Horsted Keynes

• Resurfaced the north end of Platforms 1 & 2 at Horsted Keynes and laid turf

• Installed a gas pipe for future use

• Built new running in boards

• Platform 1 at Horsted Keynes – canopy repairs and new guttering

• New door in OP4 and associated ramps and hand rail

• Received and unloaded 4,000 tonnes of ballast

• Started the Ardingly spur earth works

• Dealt with three major water leaks

• Started the Sheffield park ground frame project

• S&T have begun the fitout preparation for the ground signal

• Re-laid the track in platforms 1 & 2 at Horsted Keynes

• Parapet replacements at Sloop and Holywell bridges

• Black hut track replacement

• Numerous building faults rectified

• The Friends groups have carried out great works at all the stations

• The lineside gangs have kept 22 miles of trackbed looking great

• The S&T teams have attended and rectified many signals faults

We are looking forward to a busy 2026.